About Electric-Substation
Hudco Electric Sub-Station comprises of 2 Nos 11KV/433 Volts, transformers of 2 MVA capacity each has been installed to feed a total load of 3671 KVA with present contract Demend of 2200 KVA backed up with 2 Nos. DG sets of 1000 KVa each to feed the entire load except Air conditioning load (1041 KW). The monthly BSES Energy bill is based on fixed charges for maximum demand plus energy consumption charges as per actual.